Pathway 2.1: Advanced CAD
Design the machine. Onshape workflows, the design process from Phase 1, and mechanisms that can actually be built in this shop. A model is done when fabrication can hold it, not when the render looks finished.

Objective: Pick one primary subteam for your first build season, meet that lead, and start its modules in order.
Phase 1 was the shared floor: how FIRST works, what a robot is made of, how build season runs, and how to power on without hurting anyone. Phase 2 is the job.
An FRC team is a small firm. Team 2064 cannot have every student design, machine, code, and run awards in the same six weeks. You will be placed on a pathway. Pick one primary path for the first season. You can help another subteam on a shop night. You do not collect four half-finished trainings and call that a specialty.
Take the Pathfinder Assessment
| Pathway | You leave Phase 2 able to | You are not cleared to |
|---|---|---|
| 2.1 Advanced CAD | Model a part in Onshape that fabrication can cut | Skip the prototype and send a pretty model to the CNC |
| 2.2 Advanced Fabrication | Run the machine you are signed off on, to a drawing | Use the lathe, mill, or CNC because you watched someone else |
| 2.3 Software & Controls | Deploy code, bind a button, and explain a failed status light | Enable the competition robot alone |
| 2.4 Media & NEMO | Do a real non-robot job: imagery, scouting, business, or outreach | Treat NEMO as the path for people who are not allowed near the robot |
NEMO means Non-Engineering Member Opportunities. It is a primary path, not a leftover. Scouting, sponsors, imagery, and outreach are how the Panther Project gets picked, funded, and judged off the field. Gracious Professionalism and Coopertition show up here as much as they do in the pit.
Pathway 2.1: Advanced CAD
Design the machine. Onshape workflows, the design process from Phase 1, and mechanisms that can actually be built in this shop. A model is done when fabrication can hold it, not when the render looks finished.
Pathway 2.2: Advanced Fabrication
Build the machine. CNC router, lathe, mill, and 3D printers. Every machine has its own sign-off. Phase 1 safety is the ticket into the room, not a license for the spindle.
Pathway 2.3: Software & Controls
Bring the robot to life. Java, WPILib, autonomous, sensors, and the button map the drive team actually uses. Code that has not been deployed and driven is not done.
Pathway 2.4: Media & NEMO
Build the brand. Imagery, scouting, business, and outreach. These jobs run during build season, not after the robot is finished. A missing scouting sheet loses matches the same way a missing wire does.